Paramount Pictures: Brad Pitt Press Junket

Case History
Client
Paramount Pictures
Location
Hotel María Cristina, San Sebastián
Event
74th San Sebastián International Film Festival
Talent
Brad Pitt and David Ayer (Heart of the Beast)
Spain Production Support
Camera Crew Spain
Our Scope
Logistics, equipment, technical support, backdrops, studio setup
David Ayer and Brad Pitt in front of our Heart of the Beast backdrop during the press junket at Hotel María Cristina, San Sebastián
In this Case History

The Brief

Brad Pitt came back to the San Sebastián Film Festival this September (his first visit since Inglourious Basterds in 2009) to present Heart of the Beast with director David Ayer. It’s Paramount’s survival thriller about a former Special Forces soldier and his dog, stranded in the Alaskan wilderness.

Paramount needed a local partner in Spain for the press junket: two days in a suite at the Hotel María Cristina, run for them by an agency. The agency brought the talent schedule and the press list. We brought everything else, from the van outside to the studio inside the suite.

The Real Challenge Was the Clock

A hotel suite is a tight set, but that’s rarely what goes wrong on a junket. Pace is. Interviews run back to back, some journalists in the chair across from the talent, others dialing in remotely, each with a fixed slot and no room for a second take.

Ever watched a junket schedule slip because the talent got uncomfortable? It happens fast, and it rarely recovers. So the job was really two jobs: keep a fast-moving press day on time inside one room, and make sure Pitt and Ayer were more than comfortable in it from the first interview to the last.

What We Did

We ran a setup specifically we built for the location we were in: as much as compact as possible to improve everyone’s comfort, without compromising the final quality.  Two Sony FX6s: one on Pitt and Ayer side by side, one on whichever journalist was in the room. Remote journalists came in on the screen facing the actors, so the talents could directly interact. A 19-inch Atomos Sumo gave the agency live review of every frame.

A Wall of Heart of the Beast

A hotel suite looks like a hotel suite. So we printed two custom Heart of the Beast backdrops, designed to match the film’s visual identity: a 3-meter one behind Pitt and Ayer, covering almost the entire wall, and a 2-meter one behind the journalist. Both filled the full drop on camera. Every angle, on either side of the interview, landed on the film and not on the María Cristina’s décor. Lighting came from our own inventory, sized to the room rather than to a stage.

One Feed, One Server, Every Outlet

Every interview streamed live to the agency’s production team and uploaded to their server as it wrapped. From there, they cut and sent the right segment to each outlet. No card handoffs between slots, no one waiting on a download while the next journalist sat down.

Who We Brought In

We brought in a lean local team:

  • Two camera operators
  • Producer
  • Set assistant
  • Driver

That’s it on our side, and on purpose. The room also held the agency’s team plus Pitt’s and Ayer’s own make-up artists and security. In a suite, every extra body costs space and calm. Everyone knew their role, and our crew worked around the rest without getting in the way.

The Case Nobody Asked For

We packed more than the equipment list asked for: backup bodies, spare cabling, the “just in case” kit that never shows up on a quote. On most shoots it rides home unopened. On a junket with Brad Pitt for Paramount, you don’t want to find out you needed it halfway through the second day.

Why This Worked

Keeping the crew small and the kit deep was the right call. A junket’s pace in a tight room is a logistics problem before it’s a camera problem, and the fewer moving parts in the suite, the calmer the room stays for everyone, talent included.

We won’t pretend the crew wasn’t excited to work with Brad Pitt. They were. He made it easy, sharp and professional in every interview and just as easy to be around between them. That matters more than people think on a day built entirely around one person’s time.

It’s the kind of job our interview production setup exists for, and the same approach we break down in our guide to running press junkets in Spain.

Two days, one suite, one wall of Heart of the Beast. Not a bad week at the festival.

Contact Us Today
Our Heart of the Beast press junket set in a San Sebastián hotel suite: printed backdrop, lighting and camera monitorOur Atomos Sumo 19 monitor showing the live two-shot of David Ayer and Brad Pitt against the Heart of the Beast backdrop